Skip to content

Experience 

APA YANG ANDA CARI?

Website

www.ptsafiqcakradayamandiri.com

2013

PT. CRANE TECH Engineering & Service

  • Install Scafolding, Rental Alat Berat

PT. DAEKYUNG INDAH HEAVY INDUSTRY

  • Membuat tangki di PT ASC, Supply Plate, Rental Alat Berat, dll

PT. PUNDI KENCANA

  • Pengecetan Epoxi Jalur Pejalan di Warehouse Tepung& Pollard PK 2
  • Pengadaan dan Pemasangan AC (17 Unit)

2014

TOYO ENGINEERING COORPORATION

  • Dredging and Compaction of New Laydown at NSI Area
  • Walkway & Safety Board I Front of TOYO
  • Additional Toilet & Storage Room
  • Walkway & Safety Board I Front of TOYO & Cilent site Office

PT. PUNDI KENCANA

  • Pekerjaan Partisi Warehouse Office 2 Lt & 3 Lt
  • Pengecetan Layout Line Warehouse (Finish Good)
  • Supply & Install Partiton Including Windows & Doors
  •  Tambahan Bangunan Cleaning Pallet Pk2
  • Pekerjaan Pondasi Saluran Air Area Loading Pk1

2015

TOYO ENGINEERING COORPORATION 16

  • Demolishing of Temporary Facility

PT SWADAYA GRAHA

  • Underground Piping Work – SRI IKPT Project

PT. INTI KARYA PERSADA TEKNIK

  •  Supply & Installation of Additonal Portabel Toillet
  •  Portabel Toilet Services (First 2 Months)
  • Supply Portabel Toilet & Maintenance Work (SRI U3)

2016

PT INDO RIAU PERKASA

  • Coating Layar & Lining Area
  • Recouting Skid Floor H2 Cell Bank & Waste Water
  • Cutting & Blasting

PT SWADAYA GRAHA

  • Pek.Thust Block Project PT. SRI (IKPT)
  • Pembuatan Dudukan Tanki & Paprec Project PT. SRI

2018

PT. SARKU ENJINERING UTAMA

  • Supply Material, Supply Manpower & Rental Scaffolding

PT. KRAKATAU PERBENGKELAN & PERAWATAN

  • Pengadaan Peralatan (Flat Jack, Hand Pump, Gauge Adaptor,Tabung Gas Oksigen, Pressure Gauge, dll

2019

PT. ELIAS JAYA PERKASA

  • Blasting & Painting

PT. JGC INDONESIA

  • Provide Material and Installation of Ttemporary office
  • Provide Material, fabriation and Installation Gate
  • Provide Material & Installation fence
  • Reparen Bundwall & Excavation Fondation Tank

2020

PT. SYNTHETIC RUBBER INDONESIA

  • Repair Gedung MDP Room and Epoxy
  • Fabrication & Instalation for Platform WWTP
  • Injection Grouting For Fondation Machine U31B
  • Epoxy Lantai Loading SRITahun
  • Coating Fiber Fondation Acid
  • Leak injection in Substation 1, 2 & 3 Building
  • Repair Wall more drom freezing Cold Caused by thePipes
  • Contract Scaffolding in Maintenance PT. SRI
  • Repair Bundwall and Bak Control FSP
  • Install 9 Unit Exhaust
  • Supply Mainpower Mekanikal for Shutdown
  • Repair Bundwall

2021

PT. SYNTHETIC RUBBER INDONESIA

  • Injection Grouting For Fondation Machine U32
  • Injection Fondation Robot U32
  • Line Marking for Sign and Pedestrian in Finishing Area
  • Repair Metal Roof In Waste Area
  • Repair Concrate Road
  • Leak Injection in Substation 4 Building
  • Fabrication and Instalation Gate Bravo
  • Instal Panic Bar Exit Dor
  • Fabrication and Instalation Canopy & Coridor Lab
  • Supply Manpower Mekanikal for TAM
  • Repair Bundwall
  • Repair Gatting
  • Sound Proofing in MDP Building
  • Fabrication and Instalation Canopy Countainer Fire
  • Injection in Security Building
  • Fabrication & Installation For Monorail Hoist 6 unit

2021

PT. SYNTHETIC RUBBER INDONESIA

  • Injection Grouting For Fondation Machine U32
  • Injection Fondation Robot U32
  • Line Marking for Sign and Pedestrian in Finishing Area
  • Repair Metal Roof In Waste Area
  • Repair Concrate Road
  • Leak Injection in Substation 4 Building
  • Fabrication and Instalation Gate Bravo
  • Instal Panic Bar Exit Dor
  • Fabrication and Instalation Canopy & Coridor Lab
  • Supply Manpower Mekanikal for TAM
  • Repair Bundwall
  • Repair Gatting
  • Sound Proofing in MDP Building
  • Fabrication and Instalation Canopy Countainer Fire
  • Injection in Security Building
  • Fabrication & Installation For Monorail Hoist 6 unit

PT. ASAHIMAS CHEMICAL

  • Contract Civil Work Maintenance in PT. ASC

2022

PT. SYNTHETIC RUBBER INDONESIA

  • Praying Facility Project 2022
  • Injection Admin Building
  • Repair Pos Security
  • Repainting All Area Pedestrian & Zebracross SRI
  • Repair Trimdex Roof Maintenace Warehouse SRI
  • Design Interior & Interior BreakRoom Finishing
  • Shelter Area Breakroom
  • Empty Metal Box Project (Pembuatan Gudang)
  • Injection CCR Building
  • Scaffolding Maintenace PT SRI
  • Scaffolding Piping Duplex Project

PT. TIMAH INDUSTRI

  • Repair Bak Kontrol Chemical
  • Canopy Robot
  • Supply Atap Spandek 250 lembar

PT. ASAHIMAS CHEMICAL

  • Painting Pedestrian & Zebracross
  • Repair Concrate
  • Pembuatan Handrail Plate Area
  • Pembuatan Jalan Area Plante 20 meter
  • Repair Fondasi
  • Pembuatan Pagar ACS

2023

PT. SYNTHETIC RUBBER INDONESIA

  • Renovasi Interion Maintenance Building
  • Blasting & Painting Spool
  • New Kitting Area Warehouse Maintenance
  • Support TAM Mekanikal Maintenance Dept.
  • Design Canopy SRI Facility > Shelter Area Breakroom
  • PHYSICAL WORK IMPROVEMENT PROJECT
  • Injection Fondation Tank
  • Scaffolding Maintenance PT SRI
  • Scaffolding Piping Duplex Project
  • Modification Column 8U31 Project
  • Contract Civil Maintenance
  • Contract Scaffolding Maintenance

PT. CABOT INDONESIA

  • Storage Concrete Slab MB Area Project
  • Contract Scaffolding Maintenance
  • Install SPC
  • Repair Brick Wall Storage
  • Repair Downspout

PT. ASAHIMAS CHEMICAL

  • Contract Maintenance Civil
  • Repair Concrete
  • Make Handrail Plate Area
  • Make Area Plant 20 meter
  • Repair Pondasi
  • Make Fence ACS

PT. KARINDA DAYA PERKASA

  • Support Scaffolding Duplex

PT. FEDERAL KARYA

  • Pondasi Tanki Oil Trap Project